THE PROJECTS IMPLEMENTED BY GROUP OF COMPANIES ITATI IN THE FIELD OF THERMAL ENERGY:
2018
- “Nassiriya” TPP, Syrian Republic. Technical supervision during the inspection and repairing of 3 Siemens turbogenerators.;
2017
- “Nassiriya” TPP, Iraq. Chief-control during repairment of the turbine units.;
- “Zhizhel” TPP, Algeria. Repair of excitation system.;
2016
- The Republic of the Union of Myanmar. Heat recovery power plant, part of the metallurgical plant “Romelt”. Supervision and commissioning works on two turbo-generators, consisting of K29-3,4 turbines and T-32-2V3 generator.;
- CHPP-6 PJSC “KYIVENERGO”, Ukraine. Construction, installation and commissioning works on the reconstruction of the heat metering unit on basis of Ovation system of the Emerson company.;
- CHPP-5 PJSC “KIEVENERGO”, Kiev, Ukraine. Installation, supervision and commissioning of the thyristor independent excitation system of the STS-2E-350-2000-2.5M UHL4 generator of the power unit No. 1 at CHP-5.;
2015
- “Zhizhel” TPP, Algeria Overhaul of the Turbine generator TGV-200M Unit No.1 Emergency repair of Turbine generator TGV-200M of the Unit No.3 Overhaul of the Excitation system of TG STSV-550-2250-2-04.Checking and starting tests of the excitation system of the generator of unit No. 1, high-voltage tests of transformers (excitation transformer 4 MVA, auxiliary transformer 30 MVA, block transformer 250 MVA).;
- TPP of PJSC “DNIPROAZOT”, “KURAKHOVSKAYA TPP”, Ukraine.Installation of the regulation system manufactured by EMERSON.;
2014
- Slavyanskaya TPP, Ukraine. Overhaul of the stator and rotor ТГ ТВВ-800-2ЕУ3
- PJSC “Dneprodzerzhinskaya CHPP, Ukraine.Overhaul of the turbogenerator Unit No.4 АТ-25-2
2013
- Burshtyn TPP, Ukraine. Modernization with the replacement of the stator winding TG TGV-200M;
- Zmiev TPP, Ukraine. Ongoing repairs and overhaul of the turbine K-200-130 LMZ, K-300-240 HTGZ, replacement of condenser tubes of all 10 units. Replacement of generators on units Nos. 1, 4 with a capacity of 200 MW. Reconstruction of the turbine K-300-240 HTGZ st. №7 – 8.
- Tripolskaya TPP, Ukraine. Overhaul, permanent repairs of turbines K-300-240 HTGZ (removal and installation of the IPC, first flow and LPC with restoration of the supporting surfaces of the LPC). Replacement and installation of 2 generators TGV-300. Repair of generators with the installation of radial seals.
2012
- Zuyevskaya TPP, “DTEK Vostokenergo LLC “, Ukraine.Modernization of hydraulic parts of turbine regulation system of K-300-240 and OP-12PM of power unit No.4
- Burshtyn TPP, Ukraine Modernization of the turbine regulation system of the power unit No.5
- Stavropol TPP, Ukraine. Installation of turbine unit K-300-240 HTGZ №1.
- Zuevskaya TPP, Ukraine. Mounting of the turbine К-300-240 ХТГЗ unit No.1 and 2 with full installation of all equipment of the turbine hall, BNS and pumps, cooling towers, generator installation. Overhaul with installation and dismantling of LPC turbines K-300-240 with the restoration of reference surface of LPC (the method is patented) of turbines No. 1, 2, 3.
- Kharkov TPP-5, Ukraine. Overhaul, running repairs of turbo units T-100-130, T-250 / 300-240, repair of auxiliary equipment.
- Lugansk TPP, Ukraine. Overhaul of turbines K-200-130 LMZ. Installation and dismantling of the generator TGV-200. Development, manufacturing and implementation of a ball cleaning system with rotating filters for pre-cleaning condenser tubes.
- Kurakhovskaya TPP (station No.5, 7), Ukraine. Overhaul of the turbine K-200-130 LMZ. Reconstruction of turbines K-200-130 LMZ with the removing of Bauman Steps and restoration of the supporting surfaces of LPC.
- Alchevsk Metallurgical Plant, Alchevsk, Ukraine. BKZ-185 boiler installation, 12 MW turbo unit installation, installation of K-4250 turbochargers with VK-22 turbine, installation of K-1500 compressor.
2011
- Starobeshevskaya TPP of Donbassenergo, Ukraine.Reconstruction of the turbine K-200-130 LMZ of the power unit No. 5 with removing of the Bauman stage with dismantling and installation of the IPC, LPC and restoration of the supporting surfaces of the LPC
- Sumy CHPP, Ukraine.Overhaul of the turbine AP-12 “Igor” Unit No.2
- Sumy CHPP, Ukraine.Repair of high-pressure rotor of the turbine АТ-12 “Igor”
- Sumy CHPP, Ukraine.Overhaul of the turbine AP-12 “Igor Unit No.1
- Burshtyn TPP of Zakhidenergo, Ukraine.Reconstruction of the turbine K-200-130 LMZ of the power unit No.5.
- Uglegorskaya TPP, Ukraine. Installation of the boiler TGMP-207 block 800 MW No. 5, 6, 7, repair of the turbines К-300-240 HTGZ.
- State Enterprise “Cogeneration plant-2” Eshar “, Ukraine. Overhaul, running repairs of the turbines VK-50-90№ 7,8,9 with auxiliary equipment. Replacement of generators with reconstruction of the basis.
- Slavyanskaya TPP, Ukraine. Overhaul of the turbines K-800-240 LMZ with replacement of the rotors of LPC and flow part.
- CHPP-2 of JSC “AlES”. Kazakhstan. Services for the maintenance of the working excitation system of the Unit No. 6.
- Pridneprovskaya TPP of Dneproenergo, Ukraine. Technical re-equipment of the power unit. Development of working documentation for the connection of the excitation system SVTG-2,1k / 465-S2T2,5-AR23-UHL4 to the TG-9 unit
- Chisinau TPP-2, Moldova. Service of excitation system UNITROL 5000
- CHPP-2 of JSC “AlES”, Kazakhstan.Services for maintenance of the working excitation system of the Unit No. 6
- State Enterprise “Cogeneration plant-2” Eshar “, Ukraine. Running repair of the control system of the Unit No.7
- State Enterprise “Cogeneration plant-2” Eshar “, Ukraine. Evaluation of the working capacity of the metal elements of the turbogenerator VK-50-2 Unit No.7
2010
- Chisinau CHPP-2, Moldavia. Service of excitation system UNITROL 5000
- Kurakhovskaya TPP, Ukraine. Modernization of the generator type TGV-200M (thyristor excitation system) of the power unit No. 7 produced by the Kharkov NPO “Electrotyazhmash” (development of design documentation for the connection of the excitation system, dismantling, installation, commissioning).;
- CHPP-2, Alma-Ata, Kazakhstan.Maintenance of the working excitation system of the power Unit No. 6
- Elektrinai TPP, Lithuania Adjustment of the excitation system UNITROL 5000
- Chisinau TPP-2, Moldova. Service of the excitation system UNITROL 5000
- Network of JSC Concern Stirol, Ukraine.Adjustment of the excitation system ШСВ-3 in idling mode and in the mode of connection to the network in operation of JSC Concern Stirol
- Kurakhovskaya TPP, Ukraine. Connection the excitation system for modernization of the thyristor excitation system of the generator TGV-200M, dismantling, construction and installation works, adjustment and testing
- Kostolac TPP, Republika Srpska Replacement of the stator winding rod Turbine generator TBV-200-2
- TPP Gatsko, Republic B and X Cap. Repair of the rotor with a complete re-wiring Turbine generator TVV-320-2
- CJSC “EC” Ukr-Kan-Power “AK” Darnitskaya TPP “, Kiev. Overhaul of the generator with removing of the rotor TV-60-2 Unit No. 7
- Gatsko TPP, Republika Srpska. Overhaul with replacement of sealing elements and lifting of the stator of the turbogenerator TVV-320-2
- Republic of Serbia and Montenegro. Overhaul with replacement of seals and removal of the rotor shroud rings of the turbogenerator TVB-200-2