THE PROJECTS IMPLEMENTED BY GROUP OF COMPANIES ITATI IN THE HYDROPOWER INDUSTRY:
2018
- Naghu HPP, Afghanistan. Construction, installation, repair, recovery and commissioning of the main and auxiliary hydromechanical and electrical equipment of hydroelectric unit No. 1 and hydrounit No. 3 on a turn-key basis.
2017
- Vartsikhe HPP, Georgia Supply, installation supervision, commissioning and testing of thyristor excitation systems 2 hydroelectric generators 25 MW
2016
- HPP Darunta, Afghanistan Supply of devices. Development of the project, assembly, manufacturing and commissioning of the processor protection panel and automatics for hydropower unit No.1
2015
- HPP “DEMBE”, Poland. Repair of water turbine GANZ MAWAG
- HPP “DEMBE”, Poland. Repair of hydro generator GANZ with a capacity of 5 MW.
2014
- Kasperovskaya HPP. Repair of water turbine РЕО 123-ББ-160
- Kasperovskaya HPP. Repair of a hydrogenerator with a capacity of 2.5 MW
2013
- Tashlyk PSPP, Ukraine. Commissioning, after-sales service of electrical equipment 0,4-15,75 kV, automation systems of power units and excitationsystems of hydrounits № 1,2; Maintenance of relay protection and automation.
- HPP Dubossary, Moldova: development of the project for the reconstruction of power equipment and automation 4 hydroelectric units 12.5 MW.
- Tashlyk PSPP, Ukraine. NAEK “ENERGOATOM”, Ukraine: “Development of design documentation for the replacement of friction pairs of the mechanical seal of the shaft of the pump-turbine of the hydrounit st.№1”
- Tashlyk PSPP, Ukraine. Repair of a hydro generator with a capacity of 151 MW.
2012
- Pavlovskaya HPP. Bashkortostan. Planned annual maintenance of excitation systems UNITROL 5000 hydraulic unit No.1-4
- Krasnokhutorskaya, Ternovskaya HPP Reconstruction of the accounting system of small hydro power plants. A complex of works on obtaining technical conditions, design, dismantling, installation works, coordination of design documentation in the relevant bodies, supply of materials, commissioning of electrical equipment
- Kanevskaya HPP. Starting-up and adjustment works on the reconstruction of the disconnector ЛР -330 ТП.
- Tashlyk PSPP. Reconstruction, restoration of the switching resource of gas-insulated circuit breakers 1QM, 2QM (repair work, equipment supply)
- Kremenchug power plant. Electrical installation work on thermal control and lighting of generator No. 3, reconstruction of electric power equipment
- Kanevskaya HPP. Starting-up and adjustment works on the reconstruction of the disconnector ШР–330-III–В1 ТП
- Kanevskaya HPP Starting-up and adjustment works on the reconstruction of the disconnector ШР-330-II-В1 ТП
- Tashlyk PSPP “, NAEK “ENERGOATOM”, Ukraine: “Development of design documentation for the replacement of friction pairs of the mechanical seal of the shaft of the pump-turbine of the hydrounit st.№1”
- Tashlyk HSPP, Ukraine. Repair of a hydro generator with a capacity of 151 MW.
2011
- Naghlu HPP, Afghanistan. Supervision over commissioning, testing, complex testing and commissioning of a static excitation system «СТС–КОСУР 201.3200-110-160-2.0 ТС4», installed in the hydroelectric unit ВГС–525 / 110-24 in the framework of modernizationworks of hydropower unit No. 1
- Saratov HPP. JSC «RusHydro». Development of design documentation for the connection of the excitation system of hydroelectric unit No. 21
- Naghlu HPP Afghanistan. Supervision over the installation, adjustment, testing and commissioning of the excitation system «СТС–КОСУР 201.3200-110-160-2.0 ТС4», installed in the hydroelectric unit ВГС–525 / 110- in the framework of modernizationworks of hydropower unit № 2, 3;
- Alexandrovskaya HPP. Installation, maintenance and repair of instrumentation (overhaul of the hydroautomatics and instrumentation system of hydroelectric unit No.1)
- Tashlyk PSPP Services in installation, maintenance and repair of electric motors, generators and transformers (Repair of electric motors, main and auxiliary equipment)
- Aleksandrovskaya HPP. Overhaul of the excitation system of hydraulic unit No.2
- Tashlitskaya PSPP, Yuzhnoukrainsk, Ukraine. Inspection of the units’ assemblies and parts of the pump-turbine and governor of the hydrounit No. 2
- Aleksandrovskaya HPP. Repair of hydro turbine ПЛ 20-В-280.
2010
- Kakhovka HPP. Setting up and commissioning of the “ALSTOM” excitation system of hydrounits No.5,6.
- Naghlu HPP, Afghanistan. Supervision over the adjustment, testing and commissioning of the excitation system «СТС–КОСУР 201.3200-110-160-2.0 ТС4», installed in the hydroelectric unit ВГС–525 / 110-24 in connection with the modernization of the hydroelectric unit No.1.
- Pavlovskaya HPP. Bashkortostan. Adjustment of excitation system UNITROL 5000 hydraulic unit No. 1 after overhaul
- Kanevskaya HPP Reconstruction of the electrical part. Disconnector ШР-330-1-И-2
- Kanevskaya HPP Reconstruction of the electrical part. Disconnector ШР-330-1-И-2
- Kanevskaya HPP reconstruction of the electrical part. Switch В-330-2
- Aleksandrovskaya HPP. Overhaul of hydro-automatics of hydrounit № 2.
- Aleksandrovskaya HPP. Overhaul of the electrical part of the oil pressure unit of the hydrounit No. 2
- Kremenchug power plant. Implementation of the complex of works on the reconstruction of the second stage of the compressor pneumatic systems at the level of +76.00 m.
- Tashlyk PSPP Repair of the control equipment (current repair of thyristor starting device ТПП-15, 75/1000-УХЛ4)
- Tashlyk PSPP Repair of measuring instrumentation (current repair of turbine automatics 1GM, 2GM)
- Tashlyk PSPP. Technical maintenance of thyristor starting device type ТПУ–15,75 / 1000
- Tashlyk PSPP. Repair of electrical distribution and control equipment (updating the switching resource of SF6 circuit breakers 1QM, 2 QM)
- Tashlyk PSPP Current repair of the electrical equipment of the switchgear input -330 кV
- Aleksandrovskaya HPP. Overhaul of the electrical part of the control system for regulating the hydraulic turbo-alternator No. 2 and the excitation system of the hydrounit No. 1
- Aleksandrovskaya HPP. Repair of a hydro generator with a capacity of 11.5 MW.
- Kremenchug power plant. Implementation of a complex of works on the reconstruction of equipment – electrical installation works of hydro unit No. 3
- Tha Ba HPP Vietnam. Commissioning after the repair of the hydraulic unit No. 3
- Tha Ba HPP Vietnam: installation supervision, adjustment of electrical equipment, control devices and measuring instruments and automation for 4 hydrogenerators with a nominal capacity of 20 MW.
- Pumping station «Nassiriya», Iraq: electrical installation works on 6 kV switchgear and 12 pump units with synchronous motors 6 kV, 1.2 MW.
2009
- Kremenchug HPP. Reconstruction of the electrical part of the hydrounit No. 2 (installation and connection of instruments for monitoring the turbine and generator No.2, automation of the drainage and drainage system, power supply and installation of the flow switch for the replacement of the water supply system, additional electrical installation works at the Unit No.2)
- Dneprodzerzhinskaya HPP. Reconstruction of the pneumatic facilities. Replacement of compressors, electrical works
- HPP Darunta, Afghanistan Organization, consultation, dismantling, installation, connection, adjustment of electrical and automation equipment, control and protection systems, technical supervision of the performance of works.
- HPP Darunta, Afghanistan Supply of devices and facilities. Development of the project, assembly, manufacturing and commissioning of the processor protection panel, automatics and control for hydrounits No.1,3
- Pavlovskaya HPP. Russia. Maintenance of excitation system UNITROL 5000 at the hydraulic unit No.4
- Kremenchug HPP. Reconstruction of the excitation system of hydroelectric unit No. 2 (installed fittings, power supply and automation of the excitation system of hydroelectric unit No. 2)
- Tashlyk PSPP Correction of the algorithms of the aggregate controllers of the automatic control panel No. 1 and the automatic control panel No. 2 to realize the automatic operating mode of the hydrounit No. 1, 2
- Kremenchug HPP. Reconstruction of the electrical part of hydroelectric unit No. 2 (installed fittings, power supply, installation of the hydraulic part of speed regulators and installation of oil pump pressure plant)
- Dnieper II HPP. Reconstruction of the 2nd stage. Development of the working documentation on a binding of circuits of secondary commutation at replacement of the excitation systems of the hydrounits No.12
- Aleksandrovskaya HPP Overhaul of signaling and thermal control equipment for hydroelectric unit No. 2
- Tashlyk PSPP Service maintenance of excitation systems of hydrounits No.1,2
- Svetlinskaya HPP, Yakutia. Industrial services on the thyristor excitation system UNITROL 5000 hydraulic unit No. 2 in connection with the change in the UNS 288OV-R board
- Kremenchug HPP Implementation of a complex of works on the reconstruction of additional technological systems of pneumatic facilities of compressor at a mark of + 76.00 m. Reconstruction of power supply systems for pneumatic facilities and fire fighting.
- Tashlyk PSPP Repair of electrical equipment КНС-2
- Tashlyk PSPP Repair of electrical equipment for automated control systems
- Kiev PSPP Reconstruction of the 2nd stage. Development of the working documentation on a binding of circuits of secondary commutation during replacement of excitation systems of the hydrounits No.3
- Zeya HPP. Commissioning and start-up tests of the self-excitation system of the auxiliary generator and the self-excitation system of the main hydrounit No. 2
- Saratovskaya HPP, Russia. Commissioning and start-up tests of the self-excitation system of the main hydrounit No. 7, 8
- Zaramagskaya HPP. Commissioning and start-up tests of the self-excitation system of the main hydrounit No. 1
- Kashkatau HPP, Russia. Commissioning and start-up tests of the excitation system of the hydroelectric generators No. 1,2,3
- Dneprodzerzhinskaya HPP, Ukraine: Replacement of compressors, reconstruction of pneumatic structures.
- HPP Thak Ba, Vietnam: reconstruction project of 3 hydrogenerators 25 MW.
- Kiev PSPP, Ukraine: development of working documentation on the binding of secondary circuit commutation during replacing the excitation systems of hydrogenerators No.1 and 2.
2008
- Nasiriya Pumping Station, Iraq Installation and commissioning of 6 kV switchgear and pump units (12 pcs.) with synchronous engines of 6 kV, 1.2 MW
- Pavlovskaya HPP (Bashkiria) Reconstruction of thyristor excitation system UNITROL 5000 hydroelectric unit No.3
- Kyiv hydro power station “Ukrhydroenergo”. Reconstruction of the 2nd stage Development of working documentation for binding secondary commutation circuits during the replacing of excitation systems for Units No. 5,6,7,8.
- Electrical equipment for feeding dredgers and pumping station of hydraulic wastewater microdistrict “Osokorky central” Commissioning of 6kV electrical equipment for supplying dredges and pumping station for dredging of the Osokorky Central microdistrict
- Gissarak HPP. The Republic of Uzbekistan Supervision and commissioning of the electrical equipment of the turbine, shutter, oil pressure unit, turbine speed controller, automatic control system
- Kyiv hydro power station “Ukrhydroenergo” Reconstruction of the 2nd stage. Development of working documentation for binding secondary commutation circuits during the replacing of excitation systems for Units No. 1 and 2
- Dnestrovskaya HPP “Ukrhydroenergo”. Reconstruction of the 2nd stage Development of working documentation for binding secondary commutation circuits during the replacing of excitation systems for Units No.4
- Aleksandrovskaya HPP Overhaul of the hydrounit No.2
- Tashlyk PSPP Overhaul of an equipment of the thyristor self-excitation system СТС-370 / 2000-2,5 УХЛ-4 at the hydraulic unit No. 2
- Dneprodzerzhinskaya HPP Replacement of compressors. Reconstruction of pneumatic facilities, electrical installation work and commissioning
- Dniester HPP Commissioning of equipment, performance of test, starting tests of the main sample of the hydraulic unit and the equipment of the starting scheme
- Vartsikhe HPP, Georgia The project of dismantling and installation works, dismantling works, installation works, adjustment, tests within the framework of repair of hydraulic unit No.2
- Zeya HPP, Russia Works on adjustment of the thyristor excitation system installed on hydroelectric unit No. 2
- Pavlovskaya HPP (Bashkiria) Reconstruction of the thyristor excitation system UNITROL 5000 hydroelectric unit No.1. Adjustment of the current sensors in the CROWBAR circuit from the interference of hydraulic units No. 1-4
- Kremenchug power plant Reconstruction of additional electric systems of the pneumatic facilities with the replacement of compressors (Reconstruction of the pneumatic facilities., Power supply, automation of the ventilation system, cable layout, replacement of compressors)
- Dneprodzerzhinskaya HPP, Ukraine: commissioning of SF6 circuit breakers of 110, 330 kV switchgears and compressors after reconstruction.
2005
- Dnieper HPP, Zaporozhye, Ukraine: electrical work during the reconstruction of a special portal bridge crane.
- HPP Thak Ba, Vietnam: reconstruction project of 3 hydrogenerators 25 MW.
- Tashlyk HPP, Ukraine: commissioning, after-sales service of electrical equipment 0,4-15,75 kV, automation systems of power facilities and excitation systems for hydrounits No. 1,2; maintenance of relay protection and automation.
- Kremenchug HPP, Ukraine: wedging of rotor of hydro-generator No. 2. Reconstruction of additional electrical systems of pneumatic facilities with replacement of compressors.
- Dniester HPP, Ukraine: Development of the working documentation for the replacement of systems of excitation of hydrogenerators No.4,5,6,7,8;
2003
- HPP Gazi Baroza, Pakistan: commissioning of digital excitation systems UNITROL-P for five (5) hydro generators with a rated capacity of 294 MW.